News Release
Daura Gold Announces Binding Offer to Acquire the Yanamina Epithermal Gold-Silver Project in Ancash Peru

June 2, 2025

June 2, 2025 – Vancouver, British Columbia – Daura Gold Corp. (TSXV: DGC) (the “Company” or “Daura”) is pleased to announce that it has entered into a binding offer letter, dated May 29, 2025 (the “Offer”), with EV Resources Limited (“EVR”), an arms-length party, to acquire the Yanamina gold-silver project (the “Yanamina Project”) located in Ancash Department of central Peru (the “Transaction”).  


Highlights

  • Acquisition of the Yanamina Project, approximately 40km north of Daura’s high-grade Antonella target and the bonanza grade San Luis Gold Project owned by Highlander Silver.
  • The Yanamina Project has historical indicated resources of 1,566,900 tonnes at 1.65 g/t Au for a total of 83,100 (oz) of gold (Au) and 3,235,000 tonnes at 1.19 g/t Au for a total of 123,700 ounces of Au. The Company plans to undertake work to verify and update the historical estimate as a priority.
  • Significant exploration upside and multiple drill targets on the property given limited and focused historical drilling. Open extensions to resources at depth and lateral extensions and significant faulted extension target at depth.  
  • Previous drilling identified a high-grade core zone locally grading at 5 g/t Au over 5 meters within a mineralized envelope averaging 2.5 g/t Au over intervals from 20-30 meters.  
  • Daura has an opportunity to update the Yanamina historical resource estimate and bring a current resource estimate into Daura’s resource profile.  
  • Yanamina compliments Daura’s project portfolio in the Ancash Department, which is well-known for mining in Peru with major historical production from Barrick’s Pierina gold mine, approximately 40km from Yanamina. And 94km from the Tier 1 Antamina Mine, owned by Glencore, Teck and Mitsubishi.  


(See “Yanamina Historical Mineral Resource” below for further details.)


A qualified person has not done sufficient work to classify the historical estimate as a current mineral resource and the Company is not treating the historical estimate as a current mineral resource.


Luis Saenz, Daura CEO commented: “The acquisition of the Yanamina Gold-Silver Project marks an exciting prospect for Daura Gold as we expand our footprint into one of Peru’s most prolific mining districts. Only about 40km north of our existing land package at Antonella, Yanamina is a perfect complement to Daura’s asset base.” said Luis Saenz, CEO of Daura. “With a significant historical resource, clear exploration upside, and proximity to premier deposits like San Luis and Pierina, Yanamina presents a compelling opportunity to unlock value for our shareholders. This transaction aligns with our strategy to build a high-quality portfolio of gold assets with near-term growth potential and strong leverage to rising precious metals prices.”

Exploration Upside Potential

The historical work carried out for historical resource estimates highlighted a number of areas at Yanamina which show potential for additional mineralization, both as an extension but also proximal to the existing resource. As a result of the extensive and important surface alteration within the mineralized zone, a number of these target areas can be initially geologically explored, including mapping, sampling and geophysics, among others, to determine their potential.

An additional exploration target which remains open is the potential faulted extension to the existing historical resource. The historical resource is located on a fault scarp and there is sound geological evidence that the top of the resource has been removed by faulting. The extent of the “missing” upper portion of the resource is unknown, offering a straightforward exploration target with upside potential.


In 2006, ASX-listed Latin Gold completed detailed mapping of the geology and alteration, channel sampling, limited adit sampling, digitizing of the historic and current data base and drilled 25 diamond drill holes totaling 1,468 meters. The drilling confirmed the geology and the near surface zone of disseminated gold and silver mineralization, which is locally exposed in outcrop. Gold was intersected in the majority of the drill holes and demonstrated strong continuity along strike.


The drilling also identified a higher-grade core zone locally grading 5gpt Au over 5 meters within a mineralized envelope averaging 2.5gpt Au over intervals ranging from 20 to 30 meters. The drilling also confirmed the coincident silver values reported historically ranging up to 20.3gpt Ag explored over 10 meters.

Only 12 drill holes have been executed in the potential expansion area, where there are open extensions to resources at depth and lateral extensions and significant faulted extension target at depth.  


Community Engagement

As a new operator in the Yanamina area of interest, Daura recognizes the opportunity to establish new, long-term mutually beneficial relationships with the local communities and will strive to do this from the outset. Daura’s community relations efforts at Yanamina are underway as part of the Company’s due diligence process. 


Yanamina Project Acquisition

Pursuant to the Offer the Company proposes to purchase the Yanamina Project from EVR in consideration for an initial payment of US$150,000 in cash (the “Initial Consideration”).  


The Company may make additional payments in cash or shares to EVR as contingent consideration (the “Contingent Consideration”) upon completion of certain milestones in relation to the Yanamina Project. The Contingent Consideration is only accrued and payable if and when the following milestones are achieved:


  1. On the 12-month anniversary from Closing, the Purchaser will pay to the Vendor US$150,000 in cash;
  2. On the obtaining of a social license (that will allow a minimum 10,000 meter drilling campaign) with the communities in the area of influence of Yanamina, the Company will pay EVR US$1,700,000 in cash and/or common shares of the Company at the option of the Company;
  3. Within 60 days of the start of construction of Yanamina, the Company will pay EVR US$2,000,000 in cash and/or common shares of the Company at the option of the Company; and
  4. Within 60 days of the start of Commercial Production on the Project, the Company will pay EVR US$2,000,000 in cash and/or common shares of the Company at the option of the Company.


Any common shares issuable to the Vendor, at the election of the Company, will be issuable at a deemed price equivalent to the volume-weighted average closing price of the common shares of the Company on the TSX Venture Exchange in the thirty (30) trading days prior to issuance and will be calculated using the applicable exchange rate posted by the Bank of Canada immediately prior to issuance. The deemed price of the common shares will be subject to such minimum pricing as is permitted by the policies of the TSX Venture Exchange and in no case will common shares be issuable at a deemed price of less than (Cdn)$0.05.


Project Agreement

The Yanamina Project is currently subject to the terms of a project agreement (the “Project Agreement”) involving Happy Diamonds Pty. Ltd. (“Happy Diamonds”). Following completion of the Transaction, in addition to the payments outlined above, the Company will assume responsibility for all obligations due and owing under the Project Agreement, including the following payments owing under the Project Agreement:


(i) on or before the fifth (5th) business day following the commencement of construction of infrastructure for commercial production at the Yanamina Project, pay to Happy Diamonds the sum of US$1,500,000 in cash;

(ii) on or before the tenth (10th) business day following the date of the initial gold pour from the Yanamina Project, pay to Happy Diamonds the sum of US$1,000,000 in cash;

(iii) on or before the tenth (10th) business day following the first (1st) anniversary of the date of the initial gold pour from the Yanamina Project, pay to Happy Diamonds the sum of US$1,000,000 in cash;

(iv) on or before the tenth (10th) business day following the second (2nd) anniversary of the date of the initial gold pour from the Yanamina Project, pay to Happy Diamonds the sum of US$1,000,000 in cash; and

(v) on or before the tenth (10th) business day following the production of 275,000 ounces of gold (or gold products containing the equivalent of such amount of refined gold using, for other precious metals, the gold equivalent ounces thereof) from the Yanamina Project, pay to Happy Diamonds the sum of US$1,000,000 in cash.


Completion of the Transaction remains subject to a number of conditions, including negotiation of definitive documentation and approval of the TSX Venture Exchange. The Transaction cannot be completed until these conditions have been satisfied, and there can be no assurance that the Transaction will be completed as presently contemplated.


The Company does not expect the Transaction to result in a change of control for the Company, or to constitute a “fundamental acquisition” for the Company, within the meanings prescribed by the policies of the TSX Venture Exchange. The Company does not anticipate that the Yanamina Project, if acquired, would represent the majority of the assets of the Company, nor is pit expected to the principal focus of the Company in the next twelve months.


Yanamina Historical Mineral Resource

The historical mineral resource is included in a Technical Report titled “Deposit Modeling, NI 43-101 Resource Estimate, Preliminary Economic Assessment: Yanamina Gold Property” (the “Technical Report”), with an effective date of February 28, 2011. The report was prepared as a National Instrument 43-101 – Standard of Disclosure for Mineral Projects (“National Instrument 43-101”) technical report for Coronet Metals Inc. The historical estimate is considered to be relevant and for the purposes of the Company proceeding with the Transaction as it provides an indication of the potential significance of the Yanamina Project.


The Technical Report provides details on mineral resources and reserves, as well a potential development option for the Yanamina Gold Project that considers underground mining and processing using conventional cyanide leach methods. However, the prices, costs, and development strategy and options are no longer current and need to be re-evaluated using assumptions and qualifications that are more reflective of today’s environment.


The Yanamina gold and silver deposit is a volcanic hosted, low sulphidation, epithermal quartz system. 


The Yanamina historical Mineral Resource data base has a total of 2,643 samples, spanning 3,402 meters from 78 drill holes. The indicated resource covers approximately 17 hectares and is outlined by a search area of 25 metres; within this area, the drill holes intersected similar grade‐thickness composites at a 1g/t Au cut‐off. The inferred resource is outlined by a search area of 50 metres. The holes drilled in this area intersected mineralization defined by 0.5gpt cut‐off composites. Continuous blocks within the 25m search radius have thus been defined as an Indicated Resource while the blocks outside of this zone at a 50m search radius and those blocks above the 0.5 g/t Au cut‐off in Zone 2 are categorized as an Indicated Resource. Further drilling at 25m spacing would be required to define additional Inferred Resources in both zones.

Notes:

  • A qualified person has not done sufficient work to classify the historical estimate as a current mineral resource and the Company is not treating the historical estimate as a current mineral resource. Additional work including some re-sampling of historical core and a review of the geological model, will be necessary to verify the historical resource estimate.


Qualified Person

All scientific and technical information contained in this news release has been reviewed, verified and approved by Owen D. W. Miller, Ph.D. Member AIG, a qualified person as defined in National Instrument 43-101. Dr. Miller acts as an independent third-party consultant of the Company.

About Daura Gold Corp.

Listed on the TSX Venture Exchange, Daura Gold Corp is advancing high-impact exploration projects in Peru’s renowned Ancash region. Daura Gold owns a 100% undivided interest in over 8,100 hectares of exploration concessions in Ancash, including the 900-hectare Antonella target, which is the primary focus of Daura Gold’s current exploration efforts. 


For further information please contact:


Daura Gold Corp.

543 Granville, Suite 501

Vancouver BC V6C 1X8

William T.P. Tsang CFO and Secretary

(604) 669-0660

btsang@seabordservices.com



Cautionary Statement Regarding Forward Looking Information:


Information set forth in this news release contains forward-looking statements. These statements reflect management's current estimates, beliefs, intentions and expectations; they are not guarantees of future performance. Daura cautions that all forward-looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond Daura's control. Such factors include, among other things: future prices and the supply of gold and other precious and other metals; future demand for gold and other valuable metals; inability to raise the money necessary to incur the expenditures required to retain and advance the property; environmental liabilities (known and unknown); general business, economic, competitive, political and social uncertainties; results of exploration programs; risks of the mineral exploration industry; delays in obtaining governmental approvals; adverse weather conditions and failure to obtain necessary regulatory or shareholder approvals. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Daura disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.


NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

share this

Other Recent Daura Gold News Releases.

March 4, 2026
March 4, 2026 – Vancouver, British Columbia – Daura Gold Corp. (TSXV:DGC) (the “Company” or “Daura” ) is pleased to announce that it has expanded the land package of the 100%-owned Tayacoto Project located in Peru (“Tayacoto” or the “Project”), by staking the 1,000-hectare Agustina concession immediately north of Tayacoto. This strategic acquisition consolidates the Company’s control over the northern extension of the interpreted structural corridor that hosts mineralization within Tayacoto. The concession was acquired by direct application through INGEMMET, Peru’s state agency for mining concessions. Mark Sumner, Daura’s CEO, commented: “The addition of the Agustina concession represents an important step in consolidating the broader Tayacoto district. Tayacoto hosts high-grade silver-gold-copper-lead vein mineralization outboard of Daura’s principal porphyry-type exploration targeting. The addition of Agustina strengthens our control in the area, providing an opportunity to expand both the known polymetallic vein systems and evaluate the porphyry potential in a mineralizing district containing world-class deposits that fit within an iIntrusion-centered exploration model.” The concession (highlighted in red with a black outline in Figure 1 ) lies within a region previously termed the Pucajirca Volcanic Center. This ‘volcanic center’ contains a number of porphyry-type prospects hosted within the Calipuy Volcanic Group, including Highlander Silver Corp.’s Cerro Colorado and Daniela projects. Previously reported reconnaissance mapping and sampling within the Tayacoto concession returned high-grade surface sampling results, including 6.1 g/t Au, 1,153 g/t Ag, 0.4% Cu, and >14% Pb ( Daura News Release, November 11, 2025 ). These results confirm strong silver-lead mineralization with subordinate copper, zinc, and gold. This reported sampling is situated approximately 2.5 km east of Highlander Silver Corp.’s Daniela project and 1.5 km west of Daura’s porphyry-type exploration target within the Tayacoto concession ( Figure 2a ). The potential quantity and grade is conceptual in nature, as there has been insufficient exploration to define a mineral resource at Tayacoto, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The Company is currently undertaking a remote sensing targeting program integrating surface sampling results, ASTER-derived hydrothermal alteration mapping, and detailed structural targeting analysis ( Figure 2b ).
February 23, 2026
February 23, 2026 – Vancouver, British Columbia – Daura Gold Corp. (TSXV:DGC) (the “Company” or “Daura” ) is pleased to announce that, following a detailed review of historical drill core, new high-grade infill sampling results have significantly enhanced the precious metals intercepts at its flagship Antonella Project (“Antonella” or the “Project”), adjacent to Highlander Silver Corp.’s Bonita Project in Ancash, Peru. The previous, private owner of the Project drilled 12 holes at Antonella in 2011 and selectively sampled drill core, leaving significant mineralized intervals unsampled. Systematic infill sampling of the historic core has increased gold equivalent ‡ gram meters * for the Project’s significant intercepts # by 51%, confirming higher-grade continuity in the key vein systems from existing core. Highlights are listed below with corresponding images, drill map and sections in Figures 1-5. Drill intercepts are in Table 1. Mark Sumner, CEO of Daura commented, “The systematic infill sampling of historic drill core has significantly increased the previously reported gold and silver intervals at Antonella, revealing wide intercepts across multiple holes and identifying high grade vein mineralization in 9 of 12 drill holes. This new data underpins the potential of the Antonella project, as well as the quality of Daura’s technical team by recognizing and executing on the opportunity to enhance our drilling dataset”. Stuart Milles, VP of Exploration for Daura, commented, “The upgraded drill intercepts at Antonella provide critical new insights into Antonella’s mineralizing system, including high-value pathfinder geochemical vectors. These data are essential for targeting high-grade extensions and expansion of the Antonella deposit in the Company’s future planned drill program”. Highlights of the Recent Drill Core Infill Sampling Program: 513 infill drill core samples were collected from the historic drill core from Antonella Main zone. CBD11004B - 22.4m at 4.36 g/t Au & 23 g/t Ag from 36.8m, including: 1.50m at 4.85 g/t Au and 11.40 g/t Ag from 40.1m; 1.20m at 8.77 g/t Au and 60.90 g/t Ag from 42.6m; 0.50m at 18.86 g/t Au and 24.50 g/t Ag from 50.2m; 0.65m at 20.52 g/t Au and 45.70 g/t Ag from 51.9m; and 0.80m at 19.25 g/t Au and 241 g/t Ag from 52.55m. CBD11004A - 17.2m at 0.95 g/t Au & 10 g/t Ag (1.11 g/t AuEq. ‡ ) from 30.4m, including; 1.10m at 2.85 g/t Au and 39.8 g/t Ag from 42.3m; and 1.30m at 2.33 g/t Au and 14.4 g/t Ag from 43.4m. CBD11007 - 8.15m at 1.98 g/t Au & 17 g/t Ag (2.24 g/t AuEq. ‡ ) from 127.0m, including; 0.85m at 8.73 g/t Au and 63.70 g/t Ag from 127.0m; and 0.40m at 15.75 g/t Au and 46.90 g/t Ag from 131.2m. CBD11001 - 6.6m at 1.61 g/t Au & 5.13 g/t Ag, from 34.2m, including; 0.20m at 47.20 g/t Au and 102 g/t Ag from 40.6m. CBD11001 - 7.1m at 1.79 g/t Au & 23 g/t Ag (2.16 g/t AuEq. ‡ ) from 100.6m, including; 0.15m at 20.22 g/t Au and 110 g/t Ag from 100.6m; and 0.35m at 24.10 g/t Au and 120 g/t Ag from 104.8m. CBD11006 - 1.0 m at 8.0 g/t Au & 54 g/t Ag (8.9 g/t AuEq. ‡ ) from 58.9m
February 17, 2026
February 17, 2026 – Vancouver, British Columbia – Daura Gold Corp. (TSXV:DGC) (the “Company” or “Daura” ) is pleased to announce that it has commenced its Phase One diamond drilling program at the Cerro Bayo Gold–Silver Project (“Cerro Bayo” or the “Project”), located in Santa Cruz Province, Argentina. Cerro Bayo is located in Argentina’s premier gold-silver district, the Deseado Massif, which has produced 600+ million ounces of silver and 20+ million ounces of gold since 1990 and hosts major mines like Newmont’s Cerro Negro and Hochschild’s San Jose. See the details of Daura’s option agreement on Cerro Bayo in the Company’s news release dated November 3, 2025 ( Cerro Bayo News Release ). “The commencement of drilling at Cerro Bayo is a key milestone for Daura and marks the first systematic drill test of this highly prospective project,” said Mark Sumner, CEO of Daura Gold. “With 15 well-defined targets supported by geochemistry and IP geophysics, this Phase One program gives us multiple opportunities for discovery and represents an important step in unlocking this project’s potential.” Drill Program Overview The Phase One drilling program will consist of approximately 22 diamond drill holes totaling 1,500 metres, designed to test 15 priority exploration targets generated from the integration of historical geochemical sampling, gradient array Induced Polarization (“IP”) survey and defined by IP Profiling. In the northern target area, three pole-dipole IP profile lines were completed, resulting in the identification of eight drill targets. Initial drilling will focus on three priority targets, which will be tested with ten diamond drill holes totaling approximately 500 metres. In the southern target area, seven priority drill targets have been outlined and will be tested with 14 diamond drill holes totaling approximately 1,000 metres. These targets are associated with Apparent Resistivity features that coincide with the surface geochemical responses and are interpreted as structural controls, consistent with the Project’s low-sulfidation epithermal gold–silver mineralization model. The objective of the program is to confirm the presence, continuity, and orientation of mineralized structures at depth, while advancing multiple target areas toward potential follow-up drilling. The Company will provide updates as drilling progresses and analytical results are received and interpreted.
ALL NEWS RELEASES

Stay Updated With Daura Gold.

Sign up for our newsletter to receive news releases and exclusive company updates.