News Release
Daura Gold Commences Drilling at Cerro Bayo Gold–Silver Project, Argentina

February 17, 2026

February 17, 2026 – Vancouver, British Columbia – Daura Gold Corp. (TSXV:DGC) (the “Company” or “Daura”) is pleased to announce that it has commenced its Phase One diamond drilling program at the Cerro Bayo Gold–Silver Project (“Cerro Bayo” or the “Project”), located in Santa Cruz Province, Argentina. Cerro Bayo is located in Argentina’s premier gold-silver district, the Deseado Massif, which has produced 600+ million ounces of silver and 20+ million ounces of gold since 1990 and hosts major mines like Newmont’s Cerro Negro and Hochschild’s San Jose. See the details of Daura’s option agreement on Cerro Bayo in the Company’s news release dated November 3, 2025 (Cerro Bayo News Release).


“The commencement of drilling at Cerro Bayo is a key milestone for Daura and marks the first systematic drill test of this highly prospective project,”  said Mark Sumner, CEO of Daura Gold. “With 15 well-defined targets supported by geochemistry and IP geophysics, this Phase One program gives us multiple opportunities for discovery and represents an important step in unlocking this project’s potential.”


Drill Program Overview

The Phase One drilling program will consist of approximately 22 diamond drill holes totaling 1,500 metres, designed to test 15 priority exploration targets generated from the integration of historical geochemical sampling, gradient array Induced Polarization (“IP”) survey and defined by IP Profiling.


In the northern target area, three pole-dipole IP profile lines were completed, resulting in the identification of eight drill targets. Initial drilling will focus on three priority targets, which will be tested with ten diamond drill holes totaling approximately 500 metres.

In the southern target area, seven priority drill targets have been outlined and will be tested with 14 diamond drill holes totaling approximately 1,000 metres. These targets are associated with Apparent Resistivity features that coincide with the surface geochemical responses and are interpreted as structural controls, consistent with the Project’s low-sulfidation epithermal gold–silver mineralization model.


The objective of the program is to confirm the presence, continuity, and orientation of mineralized structures at depth, while advancing multiple target areas toward potential follow-up drilling.


The Company will provide updates as drilling progresses and analytical results are received and interpreted.

Qualified Person

Stuart Mills, is the Company’s Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects and has reviewed, verified and approved the scientific and technical information contained in this news release. Mr. Mills is not independent of the Company, as he is the Company’s Vice President of Exploration.


About Daura Gold Corp.

Listed on the TSX Venture Exchange, Daura is exploring in Peru and Argentina.


In Peru, Daura is advancing high-impact exploration projects in Peru's renowned Ancash region, where it owns a 100% undivided interest in over 15,900 hectares of exploration concessions in Ancash, including the 900-hectare Antonella target and the 2,900-hectares of contiguous concessions at Libelulas, which is the primary focus of Daura's current exploration efforts.


In Argentina, Daura have entered into a binding Letter Agreement with Latin Metals Inc., for the right to earn up to an 80 % interest in the Cerro Bayo / La Flora Project. The project is located within the prolific Deseado Massif that hosts more than 30 mines and advanced exploration projects, including Newmont's Cerro Negro Mine, Hochschild/McEwen's San Jose Mine, and Patagonia Gold's Cap Oeste Mine. Cerro Bayo / La Flora are advantageously positioned within this world-class mining region, with strong community support and well-developed logistics.


For further information please contact:


Daura Gold Corp.

543 Granville, Suite 501

Vancouver BC V6C 1X8


William T.P. Tsang CFO and Secretary

(604) 669-0660

btsang@seabordservices.com



Cautionary Statement Regarding Forward Looking Information:


Information set forth in this news release contains forward-looking statements, including, without limitation, statements regarding the Phase One diamond drilling program at the Project. These statements reflect management's current estimates, beliefs, intentions and expectations; they are not guarantees of future performance. Daura cautions that all forward-looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond Daura's control. Such factors include, among other things: the ability of the Company to commence and progress the Phase One diamond drilling program at the Project as contemplated, future prices and the supply of gold and other precious and other metals; future demand for gold and other valuable metals; inability to raise the money necessary to incur the expenditures required to retain and advance the property; environmental liabilities (known and unknown); general business, economic, competitive, political and social uncertainties; results of exploration programs; risks of the mineral exploration industry; delays in obtaining governmental approvals; adverse weather conditions and failure to obtain necessary regulatory or shareholder approvals. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Daura disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

share this

Other Recent Daura Gold News Releases.

April 1, 2026
April 1, 2026 – Vancouver, British Columbia – Daura Gold Corp. (TSXV: DGC , OTCQB: DGCOF ) (the “Company” or “Daura” ) is pleased to provide an update on its Phase One diamond drilling program at the Cerro Bayo Gold-Silver Project ("Cerro Bayo" or the "Project"), located in Santa Cruz Province, Argentina. Cerro Bayo is located in Argentina's premier gold-silver district, the Deseado Massif, which hosts major mines like Newmont's Cerro Negro and Hochschild's San Jose. Daura has completed 14 holes across 10 drill targets and assays are pending. The Company has also commenced drilling on 3 step-back holes at the Ingrid, Elena and Eugenia target areas. The results from the first 14 holes are pending and the Company will publish the data when the assays are received in the next 4-6 weeks. Stuart Mills, VP of Exploration for Daura, commented, "We are pleased with the progress of our drilling program so far, having completed 14 holes across 10 targets. Stepping back from holes 5, 12 & 14 is expected to provide greater clarity on the broader system and help guide our next phase of drilling. We look forward to reporting results as they become available. In parallel, Geomorphic's AI platform continues to enhance our targeting by optimizing drill placement through real-time data integration and vectoring." The Company is using Geomorphic AI's proprietary artificial intelligence (AI)-driven geoscience platform. Geomorphic provides remote geological and data science support for Daura's ongoing drill program at Cerro Bayo, including geochemical baseline analysis, pathfinder modelling, spatial vectoring, target ranking, and real-time drill result integration. The work is powered by proprietary AI geology agents that streamline multi-element statistics, anomaly detection, and target scoring. As new assay data arrives, the agents cross-validate results against the surface geochemistry model, flag discrepancies, and update targeting recommendations. Geomorphic has also built custom field tooling, including assay bulletins, and a scored blind-target catalog to help Daura prioritize drill collar placements. The continuous feedback loop between field results and model refinement sharpens targeting with every hole drilled.
March 27, 2026
March 27, 2026 – Vancouver, British Columbia – Daura Gold Corp. (TSXV: DGC , OTCQB: DGCOF ) (the “Company” or “Daura” ) is pleased to announce that its common shares have been uplisted to the OTCQB Venture Market (“OTCQB), a US marketplace operated by OTC Markets Group Inc., under the trading symbol “DGCOF”. Daura’s common shares will continue to trade on the TSX Venture Exchange under the symbol “DGC”. Mark Sumner, Daura’s CEO, commented: “In addition to our existing listing on the TSXV, we are excited to announce the commencement of trading for Daura’s common shares on the OTCQB in the United States. This important step can enhance liquidity, attract a wider range of investors and significantly expand our presence in the US capital markets.” The OTCQB serves as a well-established platform for emerging and growth-oriented companies seeking greater visibility among U.S. investors. To maintain a quotation on the OTCQB, companies must adhere to strict reporting requirements, complete annual verifications, and provide management certifications, which help foster a transparent and reliable trading environment.
March 4, 2026
March 4, 2026 – Vancouver, British Columbia – Daura Gold Corp. (TSXV:DGC) (the “Company” or “Daura” ) is pleased to announce that it has expanded the land package of the 100%-owned Tayacoto Project located in Peru (“Tayacoto” or the “Project”), by staking the 1,000-hectare Agustina concession immediately north of Tayacoto. This strategic acquisition consolidates the Company’s control over the northern extension of the interpreted structural corridor that hosts mineralization within Tayacoto. The concession was acquired by direct application through INGEMMET, Peru’s state agency for mining concessions. Mark Sumner, Daura’s CEO, commented: “The addition of the Agustina concession represents an important step in consolidating the broader Tayacoto district. Tayacoto hosts high-grade silver-gold-copper-lead vein mineralization outboard of Daura’s principal porphyry-type exploration targeting. The addition of Agustina strengthens our control in the area, providing an opportunity to expand both the known polymetallic vein systems and evaluate the porphyry potential in a mineralizing district containing world-class deposits that fit within an iIntrusion-centered exploration model.” The concession (highlighted in red with a black outline in Figure 1 ) lies within a region previously termed the Pucajirca Volcanic Center. This ‘volcanic center’ contains a number of porphyry-type prospects hosted within the Calipuy Volcanic Group, including Highlander Silver Corp.’s Cerro Colorado and Daniela projects. Previously reported reconnaissance mapping and sampling within the Tayacoto concession returned high-grade surface sampling results, including 6.1 g/t Au, 1,153 g/t Ag, 0.4% Cu, and >14% Pb ( Daura News Release, November 11, 2025 ). These results confirm strong silver-lead mineralization with subordinate copper, zinc, and gold. This reported sampling is situated approximately 2.5 km east of Highlander Silver Corp.’s Daniela project and 1.5 km west of Daura’s porphyry-type exploration target within the Tayacoto concession ( Figure 2a ). The potential quantity and grade is conceptual in nature, as there has been insufficient exploration to define a mineral resource at Tayacoto, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The Company is currently undertaking a remote sensing targeting program integrating surface sampling results, ASTER-derived hydrothermal alteration mapping, and detailed structural targeting analysis ( Figure 2b ).
ALL NEWS RELEASES

Stay Updated With Daura Gold.

Sign up for our newsletter to receive news releases and exclusive company updates.